Pavers needed = patio area ÷ the area of one paver, plus 5% to 15% for cuts. A 12 × 16 ft patio is 192 square feet; 4 × 8-inch pavers cover 0.222 square feet each, so it takes 864 pavers, or 951 with 10% extra. Under them goes at least 4 inches of compacted gravel base (2.37 cubic yards, about 3.3 tons) and a 1-inch layer of bedding sand (0.59 cubic yards), with 56 feet of edge restraint around the outside.

Measuring the Patio and Picking Inputs

Measure length and width in feet. For an L-shape or a patio with a cut-out, split it into rectangles, run each one, and add the results. Choose the paver’s face size (most are sold by nominal size; check the product sheet if the actual size differs). The extra covers cuts and breakage. Base depth is the compacted crushed-stone layer, and bedding sand is the screeded layer the pavers sit on. A price per paver is optional. Results list the paver count, gravel and sand in cubic yards and approximate tons, edging length, and how deep to dig.

Pavers per 100 Square Feet

Paver sizePavers per sq ftPer 100 sq ft (no waste)
4 × 8 in4.50450
6 × 6 in4.00400
6 × 9 in2.67267
12 × 12 in1.00100
16 × 16 in0.5657
24 × 24 in0.2525

Worked Example: a 12 × 16 ft Patio

Area: 12 × 16 = 192 square feet. A 4 × 8-inch paver covers 32 ÷ 144 = 0.222 square feet, so 192 ÷ 0.222 = 864 pavers; with 10% extra, 864 × 1.10 = 950.4, rounded up to 951. Base: 192 × 4 ÷ 12 = 64 cubic feet, ÷ 27 = 2.37 cubic yards, about 3.3 tons at 1.4 tons per yard. Sand: 192 × 1 ÷ 12 ÷ 27 = 0.59 cubic yards. Edging: 2 × (12 + 16) = 56 feet. Dig depth: 4 + 1 + 2 3/8 = 7.4 inches below finished grade.

Materials for Common Patio Sizes

4 × 8-inch pavers, 10% extra, 4-inch base and 1-inch sand:

PatioPaversGravel baseBedding sandEdging
10 × 10 ft (100 sq ft)4961.23 yd³ (1.7 t)0.31 yd³40 ft
12 × 12 ft (144 sq ft)7131.78 yd³ (2.5 t)0.44 yd³48 ft
16 × 12 ft (192 sq ft)9512.37 yd³ (3.3 t)0.59 yd³56 ft
20 × 16 ft (320 sq ft)1,5853.95 yd³ (5.5 t)0.99 yd³72 ft
20 × 20 ft (400 sq ft)1,9814.94 yd³ (6.9 t)1.23 yd³80 ft

Building the Base

A paver patio is only as good as what is under it. Installation guides call for at least 4 inches of compacted crushed-stone base for patios and walkways over well-drained soil, more over clay or for driveways, compacted in 2-to-3-inch lifts. On top goes about 1 inch of coarse bedding sand, screeded level but not compacted before the pavers are set; sand should never be used to fill low spots in the base. Extend the base beyond the patio edge by its own thickness so the edge restraint has solid support.

How Much Extra to Order

Add about 5% for a simple rectangle with a running-bond or stacked pattern, 10% for most patios, and 15% for herringbone, circles or many curves and cuts. Leftover pavers from the same production run are worth keeping for repairs. Gravel and sand tonnages here use typical bulk weights; your supplier’s material may weigh a little more or less per yard.

Paver Project Mistakes

Thickening the sand to fix a bumpy base. Sand shifts; fix the base instead. Skipping compaction of the soil and each base lift, which leads to settling. Ordering base by loose volume when the depth is compacted: crushed stone loses volume when compacted, so ask your supplier how much extra to order. No slope. Patios need a slight fall away from the house so water drains. Forgetting edge restraint, which lets the outer rows creep. Digging before utilities are marked. Contact 811, the free national before-you-dig service, a few business days ahead.

Frequently Asked Questions

How many pavers do I need for a 10 x 10 patio?
100 square feet; with 4 x 8 pavers that is 450, about 495 with 10% extra.
How deep should a paver base be?
At least 4 inches of compacted gravel for patios and walkways, more for driveways or poor soils, plus 1 inch of bedding sand.
How much extra paver should I buy?
5% for simple layouts, about 10% for typical patios and 15% for herringbone or curved designs.
How deep do I dig for pavers?
Base depth plus 1 inch of sand plus the paver thickness, typically about 7 to 8 inches for a patio with 2 3/8-inch pavers.
Can I put pavers directly on dirt?
No. Without a compacted gravel base, pavers settle and shift.
How many tons of gravel do I need for a paver patio?
Base cubic yards times about 1.4 tons per yard; a 12 x 16 ft patio with a 4-inch base needs about 3.3 tons.
Should I use polymeric sand in the joints?
Joint sand is separate from bedding sand. Polymeric joint sand hardens to resist weeds and washout; follow the maker’s instructions for your joint width.

How to Use This Calculator

  1. Enter patio dimensions — length and width in feet.
  2. Choose a paver size — and an allowance for cuts.
  3. Set base and sand depths — 4 inches and 1 inch for a typical patio.
  4. Read the materials list — pavers, gravel, sand, edging and dig depth.
📚 Sources & References
  1. [1] Polycor Hardscapes. Pavers installation guide: minimum 4 in compacted base for patios, 1 in bedding sand (2023). www.polycor.com
  2. [2] Concrete Network. Thickness of concrete pavers and base specifications (accessed Oct 2026). concretenetwork.com
  3. [3] Concrete Masonry & Hardscapes Association (CMHA). Guide specification: pavers on aggregate base (accessed Oct 2026). www.cmha.org
  4. [4] 811 Before You Dig. Free national before-you-dig service (accessed Oct 2026). 811beforeyoudig.com
✅ Editorial Standards — Every calculator is built from peer-reviewed formulas and official data sources, editorially reviewed for accuracy, and updated regularly. Read our full methodology · About the author